Device checks, documentation and case publication
Observed work
The week began with a single-organization deployment architecture, still at the discussion/document stage. YenGear Y406 configurator, product-page and homepage reviews progressed locally; a real Bluetooth configuration read timed out. Media work advanced without a confirmed branded final video, channel verification, deployed site or reliable complete device read/write path.
Platform identifiers, recommendation confirmation, migration performance and deployment packaging were addressed on 13 October. An interrupted production-table change was rolled back and Modbus matching repaired. Some screen installation and old-WebView layout checks reached hardware; final migration, production deployment, device networking and newer release builds were not all verified. A mini-program project-code backend repair was committed locally, with remote and production results open.
On 14 October, a smart-power presentation continued beyond an earlier checked nine-page PDF. Project access, timestamps and mini-program scanning were tested, with permission and login failures preventing a stable complete flow. An Android reboot did confirm app autostart. Later presentation exports, builds and remote release results remained uncertain.
API performance and screen display review continued on 15 October, with priority repairs begun under a compatibility requirement. Mock-based reproduction did not establish representative-load performance. Technical-support diagrams were requested; device retesting and manual delivery remained open.
On 16 October, wiring diagrams were standardized and consolidated, a quotation PDF exported, and mini-program curves and threshold controls exercised. A read-only input count changed. Subsequent document generation, uploading, App pushes, physical-device gestures and remote serial diagnosis lacked final confirmation.
The 17 October greenhouse page, case assets, shared advertising/backlink/social rules, product catalog and quotation workbook all progressed through local work and some passing checks. Final synchronization, publication and quotation review remained unverified. laan’s explanation of offline cabinet-selector operation was added without representing it as a new hardware test.
On 18 October, product PDFs and English cloud help were updated and corrected. English documentation had a push result, and one social case post had a sending report. Product grouping preserved existing URLs. Distribution-box pages and the video continued through review, but final public playback, end-screen setup and later page publication remained unconfirmed.
Corrections
2026-10-20 · The 13 October migration recovery and rollback details are included; final migration and production deployment remain unverified.
2026-10-20 · The 13 October project-code backend repair is now recorded as a local commit, retaining remote and production verification gaps.
2026-10-24 · The updated 17 October source adds laan’s explanation of manual cabinet control while offline. It does not establish a new hardware test.
2026-11-07 · Product names, confirmed models and official references were added under the updated citation rules. The recorded outcomes and unresolved statuses were retained.