← Back to Threads
Threads / Started 2026-10-20

Minimum delivery of the standalone IoT platform

Follow the small standalone platform through scope decisions, gateway support, isolated frontend work and complete delivery checks, with design and partial tests separate from deployed results.

Timeline

Daily

The standalone IoT platform’s scope was reduced and MQTT, storage and deployment choices made. Its messaging process remained in the same repository, while remote configuration and label printing were removed. Gateway compatibility work reported 114 passing tests and the platform repository was initialized locally. The independent frontend built successfully, but the full suite was still running; complete-system and customer-deployment checks were absent.

Daily entry · Manual boundaries and a smaller standalone platform ↗
Daily

Standalone-platform 0.2.0 and tag release preparation began, without a final receipt for the morning version/push commands. An evening main push returned without a visible error, but remote tags/version were not independently read back. The shared messaging component and deployment boundary remained under discussion; full standalone delivery was not accepted.

Daily entry · Screen settings and the next MQTT connection path ↗