Project AI advisor: investigation and authorized actions

Follow project data investigation, point permissions and recommendations through cross-client/SMS confirmation, paired releases and real use. Design, tests, branch pushes and production/device execution remain distinct.

Timeline

Daily

Point permissions became the execution boundary: unbound points are neither read nor controlled; bound read-only points may support proposals requiring acceptance; explicitly controllable points may be operated directly. The backend must recheck authorization and retain constraints/auditing. Separate suggestion/execution modes were removed. Follow-up would review and remind rather than automatically reverse actions; device execution and effects were not verified.

Daily entry · Giving the AI advisor a defined investigation boundary ↗
Daily

Backend AI changes reportedly merged into local dev and passed tests. Related frontend/shared-module commits, tests and builds were reported complete with clean worktrees, but repositories remained unpushed. Changed response fields required paired frontend/backend releases. External services were unconfigured and browser/end-to-end checks unfinished. An AI-documentation inventory began without a final result.

Daily entry · Giving the AI advisor a defined investigation boundary ↗
Daily

Common UMS, mini-program and App notifications were discussed around authenticated HTTP retrieval. AI recommendation SMS would open a one-time confirmation page: merely opening it must not execute a device action; explicit acceptance or ignoring is required. Template configuration and backend tests were reported, while real receipt, phone-link behavior and test-device acceptance/ignore outcomes were still unknown.

Daily entry · PLC product material and explicit SMS confirmation ↗
Daily

The SMS confirmation page adopted a dark UI, organization identity, an optional project image and an orange primary action. Implementation began without final page acceptance. Backend/frontend development branches were reportedly pushed and synchronized, but production did not change. Migration, paired deployment and real-device checks remained separate.

Daily entry · PLC product material and explicit SMS confirmation ↗
Daily

The advisor moved toward a single cloud-function scheduling path. Manual and automatic runs share a last-run-based interval, with a ten-minute minimum. Pending proposals are kept per point: a changed action replaces the old one, while an unchanged action extends its validity. The separate cooldown and per-run success-count cap were removed from the selected design, with one action per point per run retained. Implementation and test reports cover the models, commands and UI; they do not establish complete production execution.

Daily entry · Advisor runs, screen settings and mini-program consent ↗
Daily

A saved, sufficiently configured advisor can now be run manually while disabled. Description, point selection, AI configuration and entitlement checks remain. The UI reports that a request is queued rather than already started. One direct cloud-function attempt timed out on Redis before claiming its run. A later screen showed a successful run, but the evidence does not connect that success to a verified dependency repair. A test-environment migration also hit a timeout, with its final retry result uncaptured.

Daily entry · Advisor runs, screen settings and mini-program consent ↗
Daily

History retrieval was narrowed after a run consumed a large input context. Sensor summaries begin at the last successful run, ignore failed runs and cover between ten minutes and six hours; a first run uses six hours. Sampling, statistics and raw readings remain available when needed, while controllable points use operation and alert records. A read-only production query exposed the wrong value field; the corrected query returned data, followed by reports of 185 advisor tests and later 1,145 backend tests passing. The reorganized code was reportedly merged and pushed. Server and cloud-function deployment was still in progress. A separate interpretation error treated the summary-window start as gateway recovery time; its proposed wording repair had no final result.

Daily entry · Advisor runs, screen settings and mini-program consent ↗
Daily

A Lambda-environment failure exposed missing MQTT connection settings. Laan requested alignment with production, without a captured applied configuration or verification. A later deployment-incident report attributed an unavailable Lambda to a package dependency difference. Server and another test environment reportedly completed migration and interface checks, but Lambda recovery, possible queued-message loss and real-account end-to-end refresh were unverified. No completed rollback or recovery appears in the retained record.

Daily entry · Session-state checks, a Lambda incident and image work ↗
Daily

The reviewed conversation added reports of completed Lambda redeployment and passing Django regression tests. The earlier packaging failure was attributed to a corrupted dependency-download cache. Task loss or queue backlog could not be verified without queue access. Those reports do not certify real-account, database-tool and device paths end to end.

Daily entry · Authentication release checks and advisor planning ↗
Daily

Advisor planning settled on one completion notification for a run affecting several points, with completed TODOs to be marked according to actual progress. Crop context was also discussed: existing project free text can provide context, but input guidance, prompts and structured data remained design questions. Laan sent a follow-up on that policy; no response, implementation or validation was captured.

Daily entry · Authentication release checks and advisor planning ↗
Daily

A status review still listed unfinished real-environment tool, database and hardware checks, periodic-dispatch registration and a follow-up migration. Point limits, model cost and usage at a ten-minute cadence, quotas and runtime-version differences remained open. This was planning and status review, without a newly completed test, commit or deployment in the captured activity.

Daily entry · Authentication release checks and advisor planning ↗